Skip to content
2MW CHP Industrial District Energy System
AVL was approached by our customer to build an Industrial District Energy System — a two-megawatt natural gas system to provide electricity, hot water, and steam to heat or cool the Authority’s tenant buildings on Pier 10.
This 2MW walk-in CHP system (combined heat and power) is located adjacent to the Arts & Science brewery on Burlington Street East and is part of the Authority’s move to deliver clean and efficient energy to its industrial and business tenants and to transition into an industrial hub.
hyos2021-04-09T13:26:35-04:00
Share This Post With Others!
Page load link